![]() This substrate required leveling before the installation of cementitious terrazzo. The airport’s structural floor assembly of steel, metal pan and concrete in the South Terminal deflected up to one inch, creating “bird baths” in the center of the bays. The project broke ground in May 2017 with a Phase One opening in September 2020. ![]() It included two linear North and South concourses, as well as a rental car facility. To address this exploding demand on capacity, a new $4.1 billion dollar, four million square foot terminal was constructed. Designed to handle only 10 million people a year, the facility was serving 26 million by 2019. The old airport was built in the 1960’s and had reached obsolescence. The Pandemic made planning and implementation more difficult and unsure.Largest-ever public works project in the State of Utah.First completely new, major airline hub built in the 21st century.General Contractor (South Terminal): HDJV- Holder Construction / Big D Construction Architects, Interior Designers, Engineers.ARDEX Concrete Management Systems™ (ACMS).Engineered Concrete Repair Systems (ECRS).Primers, Crack/Joint Repair and Additives.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |